* Freehold
* Residential Development Opportunity
* Outline Planning Consent Granted
* Site of Almost 0. 5 of an Acre (sts)
* Open Views to Rear
* Planning Permission for 2 New Dwellings
* Existing Bungalow to be ReConfigured
A residential development site of almost half an acre with outline planning
consent for 2 new dwellings, together with partial demolition and re -
configuration of the existing bungalow.
**Planning**
Outline planning consent was granted on the 18th October 2022 by East
Cambridgeshire District Council with a planning reference number of
21/01635/out. Copies of the planning documents are available from our Ely
Office or on East Cambridgeshire District Council's website.
Outline planning consent has been granted for residential development for the
construction of up to 2 dwellings and partial demolition and re - configuration
of the existing bungalow - outline application with access committed.
The planning application proposed 1 x 1 1/2 storey detached house of 120
square metres and 1 x 1 1/2 storey detached house of 147 square metres,
together with partial demolition of the existing bungalow (Pemberton) to allow
for the access road serving the 2 new dwellings.
**The Site**
The site currently comprises a detached bungalow sitting within grounds
approaching half an acre (sts). The bungalow currently comprises entrance
hall, bathroom, 4 bedrooms (1 ensuite), kitchen/breakfast room, lounge,
separate dining room, utility, conservatory and study. There is a gravelled
driveway and well maintained lawned gardens with a selection of established
bushes and small trees.
The site backs onto Soham Cemetery.
**Services**
We understand that mains services are available at the site and purchasers
should make their own investigations as to the exact location and capacity of
these.
**Material Information**
Tenure - Freehold
Length of lease - n/a
Annual ground rent amount - n/a
Ground rent review period - n/a
Annual service charge amount - n/a
Service charge review period - n/a
Council tax band - E
**Agents Note**
The purchaser will be responsible for the payment of the Community
Infrastructure Levy.
**Viewing**
Strictly by appointment with the Agents.